[edit] Overview
An Environmental Statement is prepared by an applicant as part of an Environmental Impact Assessment (EIA) in support of certain planning applications (see Environmental Impact Assessment for more information). It summarises the findings of the EIA process and is used primarily to inform decision makers regarding the environmental implications of the development.
In addition, it should provide appropriate information for statutory consultees, other interested organisations and members of the public and should provide a basis for consultation.
[edit] Content
There is no specific statutory format prescribed for Environmental Statements, however they must contain the information specified in the Town and Country Planning (Environmental Impact Assessment) Regulations 2011, which includes:
- Description of the development.
- Outline of alternatives considered as part of the decision making process.
- Description of the environmental aspects likely to be significantly affected by the development.
- Description of the likely significant effects of the development on the environment.
- Description of the measures for avoiding or reducing significant environmental effects.
- A non-technical summary.
- Any difficulties encountered during the EIA process.
The Environmental Statement should provide a detailed, factual account of the development, but Schedule 4 of the Regulations promotes emphasis on the 'main' or 'significant' effects.
Additional guidance is available on the government's Planning Practice Guidance website.
[edit] Consultation
It is not necessary to undertake consultation regarding an Environmental Statement, however, stakeholders and the local planning authority may have valuable local information which is relevant to the development.
In addition, the local planning authority may provide a formal opinion on the content of the Environmental Statement (a Scoping Opinion). When formulating a Scoping Opinion, the local planning authority must consult with relevant consultation bodies.
[edit] Submission
Where required, an Environmental Statement is submitted alongside a planning application, and should be publicised in accordance with the details of Article 13 of the Town and Country Planning (Development Management Procedure) (England) Order 2010.
Consultation bodies require a copy of the Environmental Statement and the local planning authority send a copy to the Secretary of State.
[edit] Supplementary environmental statement
'Where the original Environmental Statement was incomplete or further work on environmental effects has been undertaken, (whether or not the project has been modified since the original application and Environmental Statement were submitted) a supplementary Environmental Statement may be submitted, to add to the original, to ensure that all of the relevant environmental information is considered by the Competent Authority. The supplementary Environmental Statement may include a revision of the whole or part of the original document or additions that are needed to cover the additional information.' Ref A handbook on environmental impact assessment, 4th edition, published by Scottish Natural Heritage in 2013.
[edit] Nationally Significant Infrastructure Project (NSIPs)
The Planning Inspectorate has issued guidance for Environmental Statements in support of Nationally Significant Infrastructure Projects (NSIPs). They have requested the following is considered:
- Inclusion of a contents document including all the volumes, chapters, tables, figures, annexes and appendices that will be presented as part of the statement.
- An electronic contents document should include hyperlinks to the items listed above.
- The contents should include all documents to be read in conjunction with it.
- The electronic versions of all documents should be titled appropriately so that their subject matter is easily determined.
The Planning Inspectorate guidance suggests a scoping process is undertaken to determine the appropriate scope of the Environmental Statement.
[edit] Reform
In April 2015, the Town and Country Planning (Environmental Impact Assessments)(Amendment) Regulations 2015 came into effect, raising the threshold above which a screening decision is required to determine whether an environmental statement is necessary, as set out in the Town and Country Planning (Environmental Impact Assessment) Regulations 2011.
Controversially, this raised the threshold for industrial estates, residential developments and other urban developments from 0.5 hectares to five hectares (or 150 units for residential developments).
[edit] Digital submission
In July 2019, in what it claims is the first of its kind, Aecom issued a digital version of the Environmental Statement for the A303 Amesbury to Berwick Down (Stonehenge) project, integrating 250 documents and 7,000 pages to create an interactive platform that allows users to navigate through information intuitively.
[edit] Related articles on Designing Buildings
Featured articles and news
The continued ISG fall out, where to go?
Support for ISG contractors, companies and employees.
New HES national centre for traditional building retrofit
Announced as HES publishes survey results which reveal strong support for retrofit.
Retrofit of Buildings, a CIOB Technical Publication
Expected to become one of the largest activities in the global construction industry.
The ECA industry focus video channel
Keeping update with the industry session by session.
Over 25 recorded informations sessions freely available.
AT Awards 2024 ceremony East London October 25th.
Revisiting the AT community at the 2023 awards evening.
The Community Housing Fund and built affordable homes
CLTN reviews the impact of the Fund and calls for extension.
The grading system of the Regulator for Social Housing
A background, an explanation and ten recent enforcements.
Construction, repair and maintenance. Book review.
Putting new life into a city with a 1900 year history.
BSRIA Briefing 2024: Sustainable Futures speakers
Redefining Retrofit for Net Zero Living 22 Nov.
Wall of support for post-Grenfell regulation of electricians
Call for a shake-up of the construction industry highlighted on radio.
Digital sustainability through future AEC tools
Bringing together industry and academia to meet challenges.
Skills gap for net zero highlighted to Minister for Industry
ECA convenes roundtable discussion at Portcullis House.
Evidencing Net Zero with the new UK buildings standard
Pilot version with detailed excel proforma out now!
Scottish Building Safety Levy, in consultation
From direct remediation and the RPDT, to the costs and alternatives.
Waves of warmer homes grants for the rental sector
Boosting energy efficiency standards for all rented homes.
A refocus of the National Planning Policy Framework
Key terms described in brief, as the consultation closes the evening of the 24th.
Fortified farmhouses of the unruly 16th-and 17th-century borders.
Comments
[edit] To make a comment about this article, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.